Free tools · No sign-up

Free tools for your next project

Free tools built to the Canadian Electrical Code as adopted in BC. No sign-up, no email — just answers. If a result is close, call us and we'll check it properly.

Checker · Permits

Permit Checker

Does your job need an electrical permit? Pick the job and who's doing it — panel upgrade, EV charger, hot tub, fixture swap — and get a plain answer for Nanaimo.

Check your job →
Lookup · Insurance

Panel Brand Lookup

Is your panel on your insurer's watchlist? Pick the brand on your panel door — Federal Pioneer, Commander, Sylvania, Zinsco and more, including older models — and get a plain answer.

Look it up →
Calculator · Rule 8-200

Dwelling Load Calculator

Can my panel handle an EV charger, heat pump or hot tub? Runs the service-load calculation for a single dwelling and tells you the minimum service size.

Use the calculator →
Calculator · Rule 8-102

Voltage Drop Calculator

Can the wire run that far? Checks a long run against the 3% voltage drop limit — detached garage, hot tub, shop feed — and finds the smallest wire that holds it.

Use the calculator →
Lookup · Section 68

Hot Tub Hookup Lookup

What breaker, wire size, GFCI and disconnect does your tub need? Pick the tub's rated amps and get the Section 68 requirements in seconds.

Look it up →
Checklist · For sellers

Pre-Listing Electrical Checklist

Selling? The electrical items home inspectors flag most — walk the house, tick them off, and fix the flags before listing day.

Use the checklist →
Printable · No sign-up

Panel Directory

Label every breaker in your panel, print the directory, and stick it inside the panel door. Works for 24, 32, 40 and 42-space panels.

Label your panel →
BC Hydro · Rule 8-106(8)

Your Meter Data

Your 12-month hourly history can show room the standard calculation doesn't. Download it from BC Hydro and send us the file — we'll check it. It's often the difference between an upgrade and no upgrade.

How to download it →
Answers · No sign-up

Electrical FAQs

Permits, panel upgrades, tripping breakers, AFCI and GFCI, EV chargers, and what jobs cost — the questions homeowners ask most, answered straight.

Read the FAQs →

A note on the tools

These tools give screening estimates under the Canadian Electrical Code as adopted in BC (2024 edition). They don't replace a calculation by a qualified person, an electrical permit, or an inspection. Figures may contain errors — if the numbers are close, or before you buy equipment or wire, get the calculation checked properly. That's a free conversation, not a commitment.

Not sure what the numbers mean?

Tell us what you're adding — EV charger, heat pump, hot tub, shop — and we'll check the service and the wire together and tell you straight what it takes. No obligation.