Do I need a permit for that?
Pick the job and who's doing it, and get a plain answer. In Nanaimo and most of BC, electrical permits come from Technical Safety BC — a few cities issue their own, listed below. Most electrical work needs a permit and an inspection; the exceptions are narrow.
If you hire a licensed contractor, they pull the permit and book the inspection — it's never left to you. The permit question only really bites when you're doing the work yourself.
Your job
Adding a big load? Check the service has room first with the load calculator.
Not sure about your panel? Look up the brand — what insurers ask, and whether parts are still made.
What it means
| Who pulls it | — |
| What to do | — |
When in doubt, ask before you start — that's a free conversation, not a commitment.
More free tools: all our calculators and useful links in one place.
Homeowner permits — who qualifies
A homeowner permit is only for your own principal, detached single-family home, with the work done by you yourself. It is not available if any of these apply:
- The home is a strata unit, a non-strata duplex, or a rental or suite
- You run a business from the home
- Someone else is doing the work for you — then it's contractor work, and the contractor pulls the permit
Work under a homeowner permit still has to meet the Canadian Electrical Code and pass inspection. The homeowner submits a declaration after each phase of work, or every 180 days, whichever comes first.
Who issues the permit
In Nanaimo and most of BC, Technical Safety BC issues the electrical permit and does the inspection. A few cities issue their own electrical permits and run their own inspections: Vancouver, Burnaby, Surrey, the City and District of North Vancouver, West Vancouver, Maple Ridge, and Victoria. If your property is in one of those cities, the city is the permit office.
An electrical permit is not a building permit
Renovations and additions often need both: a building permit from the city or regional district for the construction, and a separate electrical permit for the wiring. One doesn't cover the other. Your contractor coordinates the two.
Please read this before relying on the result
This checker gives general guidance only, based on Technical Safety BC's published homeowner permit information and the Safety Standards Act delegation list, available in November 2026. It is not a substitute for Technical Safety BC, your municipality, or advice from a licensed electrical contractor who knows your job.
Permit rules and municipal delegations change over time. Information here may contain errors or be out of date. Harbour Electrical Services Ltd. isn't liable for decisions made from these results. If anything is unclear, check with Technical Safety BC or ask us — that's a free conversation, not a commitment.
Not sure? Ask before you start.
Tell us the job — or send a photo — and we'll tell you straight whether it needs a permit, who pulls it, and what it takes. No obligation.